Owner: City of Taylor
Engineer: CDG
Contract Amount: $4,728,000
This project consists of Construction of a Greenfield Mechanical Wastewater Treatment System.
This plant features:
- A wastewater Lift Station
- A Concrete Headworks Structure with Screening Equipment
- A Sequencing Batch Reactor System
- An Ultraviolet Disinfection System
- A Biosolids Screw Press
- An influent & Effluent Sampler
- Flow Metering Equipment
- An Administrative & Testing Lab Facility