Owner: City of Taylor

Engineer: CDG

Contract Amount: $4,728,000

This project consists of Construction of a Greenfield Mechanical Wastewater Treatment System.

This plant features:

  • A wastewater Lift Station
  • A Concrete Headworks Structure with Screening Equipment
  • A Sequencing Batch Reactor System
  • An Ultraviolet Disinfection System
  • A Biosolids Screw Press
  • An influent & Effluent Sampler
  • Flow Metering Equipment
  • An Administrative & Testing Lab Facility