OWNER:                                 Water Works Board of the City of Auburn

ENGINEER:                           Jacobs

CONTRACT AMOUNT:      $2,536,500.00

This project included construction of a drinking-water well building with an electrical room, pump room, and chemical feed area.  The building was slab on grade with CMU walls and masonry veneer. The roof structure was metal trusses with a standing seam roofing.