OWNER: City of Phenix City
ENGINEER: Constantine Engineering
COST: $337,500.00
This project consisted of demolishing existing 70ft diameter digester cover. Modifications were made to existing digester piping. As well as erection, painting and installation of new OTI Steel Digester Cover and accessories.